Research notes

What I examined, what I observed, and what I still don’t know.

Got an email from me? Just reply to it.

What do new ADA premises lawsuits against Southern California businesses say, and how many are filed?

What I examined

I searched the CourtListener RECAP archive of federal court records for new cases in the U.S. District Court for the Central District of California that plead both the Americans with Disabilities Act and California's Unruh Civil Rights Act, filed September 8 to October 5, 2026. That returned 250 dockets. For the 208 whose complaint was available in the archive, a script read the complaint for the business named, its address and the barriers alleged, and the U.S. Census geocoder placed 200 of the addresses in a county.

I also read California Civil Code section 55.56 on statutory damages in construction-related accessibility claims.

What I observed

Of the 200 placed addresses, 173 are in Los Angeles County, 21 in Orange County, 5 in Ventura County and 1 in San Bernardino County. Restaurants (37), coffee shops (20) and bakeries (7) are the most common business types named. Of the 208 complaints, 80 allege barriers in parking, 65 at dining tables, 53 on the path of travel and 43 at the entrance; 187 allege at least one of these.

Section 55.56(g)(2) reduces the minimum statutory damages from $4,000 to $2,000 per offense when a defendant that is a small business (25 or fewer employees and under $3.5 million in average annual gross receipts, an amount the Department of General Services adjusts) corrects all alleged violations within 30 days of being served.

What remains unclear

A complaint is an allegation, not a finding. These records do not show which defendants will fix the barriers, settle, or contest the claims, whether they qualify as small businesses, or who they will hire. Cases whose complaint is not in the archive (42 of 250) and suits filed in state court are not counted.

Working conclusion

New premises accessibility suits in this court arrive at roughly 60 a week, concentrated in Los Angeles County, and nearly all of the complaints read name the business, its address and the barriers alleged.

Sources / material

How many Texas employers lose workers’ comp mid-term and still have none on file, and when do the ones that return buy again?

What I examined

I reviewed the Texas Department of Insurance’s public proof-of-coverage dataset (data.texas.gov c4xz-httr, pulled October 5, 2026, with policies effective through September 30, 2026). I selected non-PEO policies with an annual premium of $5,000 or more that were cancelled before their expiration date between September 1, 2025 and August 16, 2026. I excluded trucking, oilfield, roofing and waste class codes, and employers whose matched Comptroller franchise-tax record shows no active right to transact business.

I counted an employer as uncovered when no other policy matching it by normalized name, first two name words plus ZIP, or street address plus ZIP, including PEO client coverage, was in force 45 days after the cancellation. This matching is mine, not a TDI determination.

What I observed

514 employers met this rule. On September 30, 2026, 373 still had no matching policy on file (median annual premium about $10,600; median 234 days since cancellation). 161 of the 373 reach their cancelled policy’s original expiration date between October 1 and November 30, 2026.

Of the 141 that did get a new policy, 74 (about half) started it within 30 days of the cancelled policy’s original expiration date; the median gap was 0 days.

For contrast, of 1,060 mid-term cancellations of $5,000+ non-PEO policies from September 1, 2025 to June 1, 2026, 34% (about a third) already had another matching policy in force the day after cancellation.

What remains unclear

The data has no cancellation reason, so I do not know why any policy was cancelled. Matching misses some links, such as sister companies and names truncated in the source: in a manual check of 51 recent rows, 4 (8%) were not truly uncovered. Four of the 373 have a non-subscriber filing. The return pattern describes employers that came back; it does not show that a still-uncovered employer will buy, or whether a PEO would accept or win it.

Working conclusion

Employers that lost workers’ comp mid-term and stayed uncovered can be identified from public Texas records, and about half of those that returned did so around their original renewal date, which the same record shows. Whether these employers are suitable or winnable PEO clients is not established here.

Sources / material

How many small-plan Form 5500-SF filers are actually crossing into a required plan audit?

What I examined

I reviewed the Department of Labor’s public Form 5500-SF datasets for plan year 2024 (754,895 non-final filings) and plan year 2025 (downloaded October 2, 2026, with extended filings still arriving), with the Form 5500 instructions. Since 2023, a defined contribution plan counts participants with account balances at the start of the plan year to decide whether it files as a small or large plan; under the 80–120 participant rule, a small-plan filer may stay small while that count is 80–120.

I classed a non-final 5500-SF reporting more than 120 participants with account balances at year end as a plan whose next return is a large-plan return, which generally requires an independent accountant’s report. This is my derived classification, not a Department of Labor determination.

What I observed

For plan year 2024, 2,408 non-final 5500-SF filings reported more than 120 participants with account balances at year end. A filter on total participants above 120 would have returned 17,159 filings, of which those 2,408 were 14%. A filter on active participants above 120 would have returned 11,400 filings and missed 1,120 of the 2,408.

For plan year 2025, the same count was 2,098 as of October 2, 2026, against 13,474 filings above 120 total participants.

What remains unclear

The datasets do not show whether a sponsor has already engaged an auditor, whether a plan will terminate, merge or change its plan year first, or whether every year-end count matches the next starting count. The figures rely on self-reported filings, and they do not show whether the plan’s advisers already knew it was near the threshold.

Working conclusion

Most small-plan filers with more than 120 people on their participant rolls are not crossing into a required audit; the subset that is can be identified from the count the rule actually uses. Whether that subset is new information to the accountants who perform these audits is not established here.

Sources / material

Can public SMARTS data identify California industrial sites entering Level 2?

What I examined

I reviewed the State Water Board’s public SMARTS industrial monitoring and facility data together with the Industrial General Permit’s Numeric Action Level and Exceedance Response Action rules. I reconstructed annual-NAL outcomes by facility and parameter and tested which facilities would meet the repeated-exceedance condition associated with a Level 1-to-Level 2 transition for the July 1, 2026 status year. Level 2 status itself is not a field in the public open-data export, so the classifications below are derived from the permit rules rather than treated as official Water Board determinations.

What I observed

For the July 1, 2026 status year, the reconstruction identified 270 facilities meeting the repeated-exceedance condition used for the derived Level 2 candidate cohort. Under the permit rules, when a discharger in Level 1 has an NAL exceedance for the same parameter again, Level 2 begins on the following July 1; the Level 2 ERA Action Plan is then due the following January 1.

That means the public monitoring record can support a reproducible derived classification and timing check for a facility. It does not make the derived status an official Water Board assignment, and it does not by itself say anything about whether a vendor opportunity is still open.

What remains unclear

The public records do not establish that a facility needs a new treatment system, that spending is still uncommitted, or that an outside vendor can win the work. A facility may use source control, pursue a demonstration, already have suitable equipment, or have selected a QISP, engineer, technology or supplier. Because official Level 2 status is not represented as a field in the open-data export, a derived classification can also differ from the Water Board’s official assignment.

Working conclusion

Public SMARTS monitoring data can be used to reconstruct facilities whose repeated annual-NAL pattern meets the permit condition associated with a Level 1-to-Level 2 transition and to derive the July 1 / January 1 timing. The main unresolved question is whether the resulting work is still commercially contestable for an outside vendor when that signal is identified.

Sources / material

What can a pending Nashville permit record actually tell an interior contractor?

What I examined

I reviewed Metro Nashville’s Building Permit Applications and Building Permits Issued open-data layers and audited six commercial interior applications that were still pending in the September 28, 2026 data snapshot. The applications data then contained filings through September 27. I compared filing dates, permit IDs, project descriptions, issuance status and whatever contact information Metro published. I did not verify subcontractor selection or bidding status with the project teams.

What I observed

Several records contained specific interior scope rather than only a generic renovation description. T2026079415, filed September 23, described a restaurant build-out with non-structural framing. T2026079412, also filed September 23, described an office remodel moving non-load-bearing walls. T2026078466, filed September 21, described a $1.3M bank tenant improvement including offices, lobby, restrooms and support rooms.

All six reviewed applications were still pending rather than issued. Contact availability was much weaker than scope detail: only one of the six contained a usable contact route in the published record. Another named a design firm without direct contact details; the remaining records provided no usable route. The open-data export has no dedicated general-contractor, owner or current plan-review-stage field.

What remains unclear

A pending permit application does not show that subcontracting work is available. It does not establish whether a general contractor or interior subcontractor has already been selected, whether pricing has closed, or whether the project will proceed as described. It also does not show whether a contractor already knew about the project from another source.

Working conclusion

The permit feed can provide a verifiable pre-issuance record of specific commercial interior scope, but scope relevance is not the same as a confirmed bidding opportunity. The key unresolved question is whether contractors can still act on these records when they first appear.

Sources / material